300 MVA of New Capacity: The Economic Case for Abuja's New Kuje/Wumba/Lokogoma Substations

Focus: Economic Perspective | Kuje/Wumba/Lokogoma Substations, FCT Abuja | $48,624,245 | 5x60MVA = 300MVA | TCN + ICC | Certified 24 June 2022 Electricity cannot power an economy if it cannot reach it. A $48.6 million transmission project in the Federal Capital Territory tackles one of the most overlooked bottlenecks in Nigeria's power sector. When Nigerians talk about electricity, the conversation usually turns to generation: how many megawatts power stations can produce. But generation is only part of story. Power must be transmitted, transformed and distributed before it reaches a home, office or factory. When any link is too weak, electricity that could have been used is lost to economy. The Kuje / Wumba / Lokogoma Substations Project , delivered for the Transmission Company of Nigeria by International Consolidated Contractors, was designed to strengthen that chain in one of country's fastest-growing regions. Awarded in May 2020 at $48,624,245 , certified complete on ...

Keeping the Lights On in Abuja's Growing Communities — Social Perspective on Kuje/Wumba/Lokogoma Substations

Focus: Social Perspective | Kuje/Wumba/Lokogoma Substations, FCT Abuja | TCN Certified Complete June 2022 | 5km Underground Cable | 24-Month On-Time For the residents of Kuje, Lokogoma and Wumba, two new substations are about more than infrastructure. They are about the everyday experience of living in a fast-growing city. Abuja's growth has been one of Nigeria's great urban stories. Over the past two decades, population expanded rapidly, new neighbourhoods spread across what was once open land. For families who moved into these communities, promise of modern city life has sometimes been undercut by infrastructure that arrived later than residents. Electricity has been one of the most visible gaps. Overloaded substations and weak supply mean frequent outages, low voltage and heavy generator dependence. The Kuje/Wumba/Lokogoma Substations Project, certified complete and fully operational by Transmission Company of Nigeria in June 2022 , was built to change that experience....